Search the Herrick Archives:
1. Name
1.1 Never officially named by Board of Trustees.
1.2 Alternate names noted:
None.
2. Location
2.1 Located at 590 Woody Hayes Drive. See map below.
For identification of other buildings shown, see Appendix A.
3. General Description
3.1 Type of construction:
Reinforced concrete and load-bearing concrete block. Steel roof framing. Brick exterior.
3.2 No. of stories:
Two stories.
3.3 Area of building:
105,090 sq. ft. gross; 85,749 sq. ft. net assignable
1. Building designed by Firestone Jaros Mullin, Inc.
2. Bids received on February 27, 1985.
3. Contractors, as reported to Board of Trustees on April 5, 1985:
General: Peterson Construction Co.
Plumbing: R.H. Reeb Co.
Heating, ventilating, & air conditioning: Duckworth Mechanical
Fire protection: Central Fire Protection Co.
Electrical: Buckeye Electric
4. Construction started on May 6, 1985. (A)
5. Building was ready for beneficial occupancy in mid-December 1986. (A)
Total estimated project cost as reported to Board of Trustees on April 5, 1985 is $11,560,000.